Engineering Design Consultants
May302018
This month has seen the installation of two high level platforms on the east side of the Forth Road Bridge. The platforms are to be used for the forth main cable inspection as part of an ongoing maintenance and inspection program which started back in 2004. Following their successful collaborations in 2017 on the M48 Severn Bridge Main Cable Inspection and also the Tamar Bridge Cable Band Bolt Replacement,… Read More...
May222018
Here at Eadon Consulting we continue to expand our capability and develop our team: two of our staff recently attended a six-day course run by Sheffield Fracture Mechanics in Buxton. Real structures always contain flaws of some form, such as weld defects, which under the wrong circumstances can result in a part failing suddenly at a much lower load than would be expected based on the yield strength… Read More...
May182018
We have recently returned from two interesting nuclear networking and information events. The first was the Game Changers Post Operational Clean Out (POCO) for Sellafield. This was an event organised by Game Changers and hosted by University of Technology of Strathclyde at their Innovation Centre. The day gave information about what POCO is, the scale of the task, challenges that Sellafield face… Read More...
Categories
Archives
Eadon on Twitter