In the News

Recent News

Archive

2025 Highlights at Eadon

17/12/2025

2025 has been a year of focus, collaboration and steady progress for the whole Eadon team. We’ve taken on more projects, strengthened client relationships and, as always, continued to deliver high-quality engineering work across multiple sectors.

A major milestone for us this year was opening our new office in Cockermouth. Having a base in Cumbria has brought us closer to several key clients and helped us build new relationships with local SMEs across the region. It’s already proving to be a brilliant addition to the business and we’re excited about the new opportunities it will open up for us in 2026.

Learning and development has long been a priority for Eadon, and in 2025 we strengthened that commitment even further. With support from Natalie Houlton at Yellow Duck Development, we launched our new ‘Learning and Development Programme’ which aims to build practical behavioural and interpersonal skills. The team have really enjoyed the sessions they’ve taken part in over the course of the year and it’s been great to see continuous development become a normal part of day-to-day life at Eadon.

Our commitment to social value has continued. Through the ‘See It Be It in Sheffield’ campaign, we’ve spent time in local schools and colleges running bridge-building workshops, sharing our career journeys and giving students a real insight into what a career in engineering is like. Inspiring young people is something we genuinely value and we’re proud of our team for giving up their time to make these sessions possible.

On the project side, we’ve delivered some standout pieces of work. Through the EIF programme, the team supported Sellafield on a major study, working collaboratively to explore viable approaches for a complex deconstruction challenge. The work involved developing and assessing a full range of options, running multiple refinement workshops and ensuring all potential methods were thoroughly considered in advance. We consistently met all agreed timescales and were transparent about the achievability of each task, delivering high-quality outputs – including visual materials that proved especially valuable in guiding decision-making. The client praised the rigour, preparation and collaborative approach we demonstrated throughout.

It’s been a bumper year for seismic analysis work,  with several major projects requiring our expertise in this area. Nuclear cranes made up a sizable portion of this. We have worked both on the client side, as an Independent Technical Assessor and as an Intelligent Customer to review seismic assessments carried out by the designers – and also on the designers’ side carrying out early analysis studies on the stability of a goliath crane under seismic loading. In the first half of the year, we carried out the seismic substantiation for a series of nuclear containment structures to estimate the anchor loads and ensure they would not topple or move in the event of an earthquake. Finally, we carried out the seismic analysis of a bespoke, reconfigurable access structure. STAAD/Pro was used to carry out a response spectrum analysis and the assessment was carried out using loading derived from ASCE VII. 

This year, we also worked with Stantec (formerly Hydrock) on an optioneering study for Nuclear Waste Services (NWS), exploring how a Multi-Purpose Disposal Container could work across both geological and surface-based facilities. Through focused workshops, we challenged assumptions, resolved key requirement conflicts and identified wider opportunities and risks that could shape the future of the programme. We’re proud of the outcome: a clear preferred way forward and valuable insights with long-term potential for the sector.

We’ve also been involved in overseeing the refurbishment and upgrade of the hydraulic systems at Tower Bridge as part of the City Bridge Foundation programme. This work includes replacing the aging Tungum pipework in the bascule chambers, paving the way for the replacement of the hydraulic motors scheduled for 2026 – upgrades which will ensure the bridge’s lifting mechanisms remain reliable and resilient for decades to come. We look forward to the next phase of this exciting project.

We were thrilled to see the Gull Wing Bridge receive two awards this year: the Bridges Design and Construction Award at the Bridges Awards 2025 and, most recently, the IABSE Award for Large Road and Rail Bridges for 2025. It was a privilege for us to contribute to such an outstanding project and these achievements are a testament to the hard work and collaboration of everyone involved.

In March we attended the Waste Management Symposia 2025 in Arizona. It was a fantastic opportunity to showcase REACH – our modular, remote handling system designed for hazardous and hard-to-access environments. Piers Turnbull being awarded Best Poster in his track at the conference for his impressive REACH poster design was a fantastic moment and brought even more interest to our stand. We were also delighted by the strong interest shown in Capsa Solutions’ nuclear waste container, which has led to some exciting new connections. Overall a highly successful and worthwhile trip – we have already signed up to attend again next year.

We’ve been delighted to celebrate some outstanding personal achievements within our team in 2025. Liam Rudge smashed the Yorkshire Marathon, cutting an incredible 50 minutes off his previous personal best to finish in just 3 hours and 7 minutes! While Dan Cunningham completed the Great North Run to raise funds for the Alzheimer’s Society – two efforts that truly made us proud. On top of that, Dan received the exciting news in June from IMechE that he is officially a chartered engineer, a fantastic milestone and a well-deserved recognition of his dedication and hard work.

As always, we’ve enjoyed plenty of team socials this year, from climbing sessions and pub trips to cheering on our placement student, Emma Taylor-Lonsdale, at the Sheffield Varsity Ice Hockey match at the Sheffield Utilita Arena. We also had a great time at our Christmas party, which was held at the Victoria Inn in Sheffield and was the perfect way to round off the year together. And, of course, our annual summer picnic wouldn’t have been complete without a few games of ‘London Ball’ – a game invented by Eadon and now a firm picnic tradition!

As we look ahead to 2026, we’re excited to build on this year’s momentum, continuing to innovate and deliver work that makes us proud. From all of us at Eadon, we wish you a very Merry Christmas and a Happy New Year! 

 

Share This