Gull Wing Bridge
Key facts
Location
In Partnership with
Suffolk County Council
The bridge features an unusual rolling bascule design where the deck rolls back onto the approach span – an engineering challenge given the lack of a fixed foundation. It is powered by a pair of huge hydraulic cylinders (580mm bore, 520mm rod, 13145mm stroke) which lift and lower the deck. The client requirement was for the bridge to open 116 seconds and close in 106 seconds to minimise disruption to traffic around the town. Meeting these operational criteria involved precise control of hydraulic systems, synchronisation of mechanical components, and seamless integration of electrical controls.
The design also features a tail lock mechanism, which locks the bridge securely in the raised position – a key safety feature especially important during high winds. The counterweight, composed of ultra-dense concrete, ensures proper balance and efficient operation.
In March 2025, the Gull Wing won the Bridges Design and Construction Award (above £10 million) at the Bridges Awards 2025. It is also shortlisted for an award at the NCE Bridges 2025 conference in July.