The Kings Arms Pedestrian swing bridge is a replacement manually actuated steel and timber swing bring in Exeter docks.
In the News
Structural Design
Nuclear Decommissioning Gantry Cranes
Eadon Consulting, working in conjunction with SCX, a specialist crane supplier, were asked to provide structural and mechanical verification calculations for a crane that will be used for decommissioning at Sellafield.
Forth Road Bridge Dropped Object Canopy
The contract to re-erect the Dropped Object Canopy on the Forth Road Bridge North Tower has recently been successfully completed by The Spencer Group, assisted by Eadon Consulting providing the temporary works design on the project. The Dropped...
Metrology Tower Structural and Seismic Design
Eadon consulting, working alongside Lindhurst Engineering Ltd and Zeeko Ltd completed the detailed mechanical drawings for a tower which is to be manufactured in India and will be installed in a new facility in Dehradun in the northern part of the country.
Grimsby Pontoon System
Following the completion of a number of offshore and marine projects, we were approached by Grahams Construction to carry out the detailed design for 3 restraint booms that would make up part of a floating pontoon system in Grimsby. Several other...
Netham Timber Lock Gates
The project involved the design of new Ekki timber lock gates to replace those at the Netham Lock the Feeder Canal. The Feeder canal is the inland link between the River Avon and Bristol’s famous floating harbour which dates back to 1809.
Killaloe Canal Flow Gates and Stop Logs
Eadon Consulting were appointed as Waterways Ireland’s preferred gate and stop log designer providing advice during the early stages of the project. The project involved the design of flow control gates to manage the water levels in the Killaloe...
Design of high integrity nuclear handling equipment
Following very positive feedback for substantiation work provided on similar previous projects, Eadon Consulting were requested by a large nuclear processing facility to provide the design and substantiation for a piece of high integrity nuclear...
Refurbishment of Dover Berths 2, 3 & 7
The Dover Port berths 2, 3 and 7 were refurbished. Eadon’s role was the redesign of the fingers linking the main span to the stern of the ship when berthed.
Carter House Manually Operated Swing Bridge
As part of the rejuvenation of the Sankey Canal running alongside the north side of the Mersey, Eadon design a manually operated swing bridge as a replacement of a fixed timber bridge used for maintenance vehicles and pedestrian access. The new...