Structural Design

Nuclear Decommissioning Gantry Cranes

Nuclear Decommissioning Gantry Cranes

Eadon Consulting, working in conjunction with SCX, a specialist crane supplier, were asked to provide structural and mechanical verification calculations for a crane that will be used for decommissioning at Sellafield.

read more
Forth Road Bridge Dropped Object Canopy

Forth Road Bridge Dropped Object Canopy

The contract to re-erect the Dropped Object Canopy on the Forth Road Bridge North Tower has recently been successfully completed by The Spencer Group, assisted by Eadon Consulting providing the temporary works design on the project. The Dropped...

read more
Metrology Tower Structural and Seismic Design

Metrology Tower Structural and Seismic Design

Eadon consulting, working alongside Lindhurst Engineering Ltd and Zeeko Ltd completed the detailed mechanical drawings for a tower which is to be manufactured in India and will be installed in a new facility in Dehradun in the northern part of the country.

read more
Grimsby Pontoon System

Grimsby Pontoon System

Following the completion of a number of offshore and marine projects, we were approached by Grahams Construction to carry out the detailed design for 3 restraint booms that would make up part of a floating pontoon system in Grimsby. Several other...

read more
Netham Timber Lock Gates

Netham Timber Lock Gates

The project involved the design of new Ekki timber lock gates to replace those at the Netham Lock the Feeder Canal. The Feeder canal is the inland link between the River Avon and Bristol’s famous floating harbour which dates back to 1809.

read more
Killaloe Canal Flow Gates and Stop Logs

Killaloe Canal Flow Gates and Stop Logs

Eadon Consulting were appointed as Waterways Ireland’s preferred gate and stop log designer providing advice during the early stages of the project. The project involved the design of flow control gates to manage the water levels in the Killaloe...

read more
Design of high integrity nuclear handling equipment

Design of high integrity nuclear handling equipment

Following very positive feedback for substantiation work provided on similar previous projects, Eadon Consulting were requested by a large nuclear processing facility to provide the design and substantiation for a piece of high integrity nuclear...

read more
Carter House Manually Operated Swing Bridge

Carter House Manually Operated Swing Bridge

As part of the rejuvenation of the Sankey Canal running alongside the north side of the Mersey, Eadon design a manually operated swing bridge as a replacement of a fixed timber bridge used for maintenance vehicles and pedestrian access. The new...

read more